Holmestown Landfill

• Civil Works €1.1m
• Bulk Excavation 2000 cu. mets.
• 2 Precast Concrete SBR Tanks(17Mx6M)
• 2 Leachate/Storm P.C. Tanks (9Mx4.5M)
• Control Building & ESB Sub-station
• Sludge Treatment Building
• Site Services, roads & pavements


Download Holmestown Case study (184 KB)





Carney Sewerage Scheme

• Civil Works €550K
• Bulk Excavation 1500 cu.mets.
• P.C. & in-situ R.C. Tanks & Pumping Station
• Control Building
• Tidal Outfall
• Site Services,Bases & Plinths
• Access Road


Download Carney Town Case study (163 KB)





Sion Cross, Carlow Town

• Civil Works €250K
• Sheet-piled Cofferdam
• R.C. Structures
• Raw-water Pipeline, 600 dia. D.I.
• Site services, Roads & Pavements
• Site Pallisade Fencing


Download Sion Cross Case study (183 KB)





Terryland Water Treatment Works

• 6 Week Construction Period
• Capital Works € 1.1M
• R.C. Chambers
• Modification of Existing R.C. Structures
• Laying of 1000 mm dia. D.I. Pipeline
• Ducts & Duct Chambers
• Liaison with U.V. System Specialist


Download Terryland Case study (153 KB)





Thurles Wastewater Treatment Plant

• Site Preparation & Ground-works
• Precast Concrete Piling
• R.C. Structures
• S.S. Framed/Cladded Sludge Reception Centre
• Inter-connecting Pipework & Ductwork
• Bases & Plinths
• Site Roads


Download Thurles Case study (153 KB)





Birr Urban Renewal

• Civil Works €60K
• Demolition/Removal Existing Footpaths/Street-furniture
• Laying P.C. Kerbing & Paviors
• Replacement of U/G Services
• Carriageway Resurfacing
• Maintaining Traffic Free-flow


Download Birr Case study (263 KB)